Insights
Stories from the field
Practical notes from installations, estate programmes and electrical works — written so owners, developers and facility teams can see how the job actually runs.
Applying for TNB supply for a new house: what homeowners need to know
Contractor or DIY tenancy change, single vs three phase, documents, connection charges and the Customer Charter timeline.
TNB supply for shoplots, offices and restaurants: the commercial checklist
SSM papers, landowner consent, non-domestic tariff, power factor surcharge and the 100A line that changes the rules.
TNB supply for factories: substations, maximum demand and the approvals behind them
Above 100A: consultant engineer, Part A/B approvals, substation handover, voltage bands, connected load charge and lead times.
How we approached solar electrical works for 120 terrace houses in Setia Alam
Sequencing rooftop PV across a live terrace estate — coordination, electrical readiness and what large residential solar programmes demand.
Fitting solar PV around a complex Semi-D roof in Johor Bahru
Multi-plane arrays, working around tanks and solar thermal, and residential electrical readiness on a real Johor Bahru Semi-D.
Integrating solar PV and an EV charger in a Kuala Lumpur home
How rooftop arrays, tidy trunking, DB protection and a BMW Wallbox come together on a dense residential site in KL.
When the power stops, the fruit doesn’t wait — LV switchboards for a palm oil mill
Why mill LV boards, automatic PFC and heavy-duty cabling are production assets — and how this installation was built for heat, dust and continuous crop.