Services · 3-phase power

Single-phase to 3-phase upgrade

Larger aircond systems, workshops, EV chargers and solar often need more than a single-phase supply can give. We handle the whole upgrade — assessment, TNB application, 3 phase meter, new distribution board and rewired loads — so the change is done once and done safely.

Scope of work

From assessment to energised 3-phase supply

Assessment and TNB application

Penilaian & permohonan TNB

  • Load calculation to confirm whether you need 3-phase and what size supply to apply for.
  • Preparation of single-line diagram and supporting documents for the TNB supply application.
  • Coordination with TNB on the 3 phase meter, service cable and site inspection.
  • Advice on realistic timelines, since TNB scheduling and approvals are outside our control.

DB and wiring

DB & pendawaian

  • New 3-phase distribution board with MCB, RCD and isolators, correctly labelled.
  • Main switch, meter board and service cable termination to TNB requirements.
  • Load balancing across the three phases so no single phase runs hot.
  • Rewiring of old circuits that cannot carry the new loads safely.

Equipment that benefits

Peralatan

  • Multiple aircond units, ducted and VRV systems.
  • Workshop machinery, CNC, compressors and three-phase motors.
  • EV chargers at 11 kW and 22 kW AC.
  • Rooftop solar systems requiring 3-phase connection.

How we work

From survey to handover

STEP 1

Load assessment

We list current and planned loads and recommend single-phase, 3-phase or capacity upgrade.

STEP 2

TNB application

Drawings and documents prepared and submitted, then followed up with TNB.

STEP 3

DB and rewiring works

New board, meter board and rewiring completed ahead of meter installation.

STEP 4

Testing and energising

Tests recorded, TNB meter installed and loads balanced after energising.

FAQ

Frequently asked questions

How do I know if I need 3-phase?
Typical triggers are multiple aircond units, heavy machinery, 11 kW or 22 kW EV charging, solar above a small size or a main breaker that trips under normal use. A load calculation gives a firm answer. Our single vs 3-phase guide explains more.
How long does it take to get a 3 phase meter from TNB?
It depends on the TNB review and scheduling, and on whether local infrastructure can support it. We prepare the application properly and follow up, but we cannot promise TNB dates.
Will my electricity bill go up with 3-phase?
The tariff is based on consumption, not on the number of phases, though some tariffs and deposits differ for commercial supply. 3-phase gives capacity; it does not by itself raise usage.
Do all my appliances need rewiring for 3-phase?
No. Single-phase appliances run on one phase of a 3-phase supply. The DB is rewired so loads are spread across the three phases, and only large equipment needs three-phase connection.
Can you upgrade a shop lot or terrace house?
Usually, subject to what TNB can supply at that location. We check the existing service cable and DB, and tell you if infrastructure will limit the upgrade.

Get a quote

Get a quote for a 3-phase upgrade

Fill in the short form — we open WhatsApp with your details prefilled. Or WhatsApp / call us directly.

Ready to upgrade to 3-phase? Free site visit & quote.