Services · Solar
Solar installation: the electrical side, done properly
Good solar needs a good electrical backbone. We work with a SEDA RPVSP partner who handles the PV system, while Elektrika — a Suruhanjaya Tenaga-registered contractor — delivers the 3-phase supply, distribution board, earthing, surge protection, testing and TNB works around it.
Our scope
Electrical works that make a solar system safe and approved
Supply and distribution
Bekalan & DB
- Single-phase to 3-phase upgrade where your tariff, inverter size or ATAP application calls for it.
- New or modified distribution board with isolators, breakers and labelled circuits for the solar feed.
- AC cable runs, cable tray and conduit between inverter, DB and meter position.
- TNB meter and supply coordination so your system can be commissioned without avoidable delay.
Earthing and protection
Pembumian & SPD
- Earthing for the PV frame, inverter and DB, verified by earth resistance tests.
- AC and DC-side surge protection devices (SPD) to protect the inverter during lightning season.
- RCD and overcurrent protection coordinated with the existing installation.
- Bonding checks so metal roofs, railings and gutters are not left floating.
Testing and handover
Ujian & serahan
- Insulation, continuity, polarity and loop impedance tests on the AC side.
- Written test records you can share with the PV partner, your insurer or the building owner.
- Single-line diagram updated to show the new solar connection.
- Practical walkthrough of isolation points and what to switch off in an emergency.
Who it’s for
Where this work fits
Homeowners on landed property
A rooftop system that is wired into a DB and earthing arrangement that can actually support it.
Shops and SMEs
Offset daytime consumption with a 3-phase supply and clean DB layout, without disturbing operations.
Factories and warehouses
Larger roof-mounted systems that need sub-boards, cable containment and protection coordination.
Developers and building owners
Electrical interface works delivered to drawings, with testing documentation for handover.
How we work
From survey to handover
Joint survey
We visit with your PV partner to review roof, DB room, meter position and supply phase.
Scope split
A written split: the partner covers PV design, modules, inverter and SEDA submission; we cover the electrical works.
Electrical works
Supply upgrade, DB, earthing, SPD and cabling installed ahead of or alongside PV mounting.
Test, TNB and handover
AC-side testing, TNB coordination and documented handover to the PV partner for commissioning.
Who does what
Partner delivery, one clear scope split
Elektrika works with a SEDA RPVSP (Registered PV Service Provider) partner. The partner designs, supplies and installs the PV system and handles the SEDA submission. Elektrika carries out the electrical works: 3-phase upgrade, DB, earthing, SPD, testing and TNB works. You get one coordinated project without us claiming PV work that belongs to the registered partner.
FAQ
Frequently asked questions
Does Elektrika install the solar panels?
Do I need 3-phase for rooftop solar?
Is solar still under NEM?
Why is earthing so important for solar?
Can you work with another solar company?
Get a quote
Get a quote for the electrical works on your solar project
Fill in the short form — we open WhatsApp with your details prefilled. Or WhatsApp / call us directly.
Planning solar? Start with the electrical survey. Free site visit & quote.
Free site visit & quote · registered contractor · tested & documented.
Petaling Jaya · Kuala Lumpur · Puchong · Shah Alam · Klang · Subang Jaya · Kajang · Cheras · Ampang · Cyberjaya · Seremban · Kota Damansara · Kepong · Setia Alam · Bangi