Guide · Energy efficiency

EECA 2024 guide: Energy Efficiency and Conservation Act

The Energy Efficiency and Conservation Act 2024 (Act 861) places statutory energy-management duties on large energy users. This guide explains who is covered, what compliance typically involves and which electrical measures help.

The Act

What EECA 2024 means in practice

Who is covered

Siapa terlibat

  • Premises whose energy consumption reaches 21,600 GJ or more per year are treated as designated installations.
  • 21,600 GJ is roughly 6 million kWh of electricity a year, comparable in scale to the threshold under the earlier regulations it replaces.
  • Consumption is measured across all energy forms, so fuel as well as electricity counts toward the threshold.
  • Smaller users are not covered by the threshold but can still benefit from the measures.

What compliance involves

Keperluan pematuhan

  • Appointing a registered energy manager for the installation.
  • Carrying out energy audits through a registered energy auditor.
  • Maintaining energy management records and reporting to the authority as required.
  • Acting on efficiency findings; the exact duties, timelines and penalties should be confirmed with the Energy Commission.

Where electrical measures help

Langkah elektrik

  • Load profiling to show how and when energy is used, which supports audits.
  • Power quality and harmonics assessment to find hidden losses.
  • Power factor correction to reduce current, losses and penalties.
  • LED retrofits and controls for lighting, which is often the quickest saving.

How we work

From survey to handover

STEP 1

Know your annual energy use

Add up electricity and other fuel use over a year and convert to GJ to see how close you are to 21,600 GJ.

STEP 2

Confirm your obligations

Check with the Energy Commission or a registered professional on your designation and duties.

STEP 3

Audit and profile

Registered energy auditors carry out the audit; load profiling and power quality data strengthen it. See our energy audit page.

STEP 4

Implement measures

Carry out power factor correction, LED retrofits and other electrical efficiency work based on audit findings.

Partner delivery

Audits by a registered partner, electrical measures by Elektrika

Statutory energy audits must be carried out by a registered energy auditor. Elektrika works with a partner registered energy auditor for that part. Elektrika supplies and installs the electrical measures that sit behind a good audit: load profiling, power quality studies, power factor correction and LED retrofit. See our energy audit service page for how the partner audit and electrical works fit together.

FAQ

Frequently asked questions

What is EECA 2024?
EECA is the Energy Efficiency and Conservation Act 2024 (Act 861). It sets duties for large energy users to manage and reduce their energy use through energy management, audits and reporting.
What is the 21,600 GJ threshold?
It is the annual energy consumption level at which an installation falls within the Act designated installation duties. 21,600 GJ is roughly 6 million kWh a year of electricity.
Does Elektrika carry out the energy audit?
No. Statutory energy audits are done by a registered energy auditor, who is our partner. We carry out load profiling, power quality studies, power factor correction and LED retrofit. Details are on our energy audit service page.
Will power factor correction help with EECA?
It reduces current and losses, and the load profiling behind it provides data that supports audits. It is one of several measures, not a compliance route on its own. See our power factor correction service for how we size and install banks.
Where can I confirm the latest obligations?
Duties, timelines and penalties are set by the Act and its regulations, and can be updated. Confirm with the Energy Commission or your registered energy professional.

Get a quote

Ask us about load profiling and efficiency works

Fill in the short form — we open WhatsApp with your details prefilled. Or WhatsApp / call us directly.

Preparing for EECA? Start with a load profile.

Free site visit & quote · registered contractor · tested & documented.

Petaling Jaya · Kuala Lumpur · Puchong · Shah Alam · Klang · Subang Jaya · Kajang · Cheras · Ampang · Cyberjaya · Seremban · Kota Damansara · Kepong · Setia Alam · Bangi