Services
3-phase power upgrades & distribution board work
We assess your load, apply to TNB where a change of supply is needed, and install or enlarge the distribution board, sub-mains and machine circuits — sized to real load calculations, tested and handed over.
Scope
What we handle
Assessment & design
Before anything is ordered
- Load calculation & maximum demand assessment
- Single-line diagram (SLD)
- Whether an upgrade is actually needed
- TNB supply application when moving to 3-phase
Distribution boards
New, enlarged or replaced
- New & enlarged DB, main switchboard (MSB)
- MCB, RCCB, RCBO & surge protection (SPD)
- Phase balancing across the board
- Clear circuit labelling & schedule
Sub-mains & circuits
Sized to the connected load
- Armoured sub-mains & rising mains
- Dedicated machine & compressor circuits
- Chiller & HVAC circuits
- Sub-metering for rental units
Who it’s for
When you need a 3-phase upgrade
Adding machinery
CNC, compressors, chillers or ovens beyond single-phase capacity.
Near your supply limit
The main breaker trips under load, or you’re close to the approved maximum demand.
New factory or workshop
Three-phase specified from the start, sized for future lines.
Splitting or sub-metering
Separating tenant or department loads onto their own boards and meters.
How we work
From load calculation to a balanced board.
Site visit & load calculation
We measure the connected load, review future equipment, and confirm whether it’s a DB job or a full supply upgrade.
Recommendation & quote
An itemised quote — and we only recommend a supply upgrade if the numbers require it.
TNB application
If you’re moving to three phase, we prepare the certificate, SLD and forms and liaise with TNB.
DB & sub-main installation
Boards, sub-mains and machine circuits installed to MS IEC 60364, prepared alongside the existing supply.
Test, phase-balance & hand over
Full test sequence, phase currents balanced, labelled board and test results.
Downtime
Changing over without stopping the line
Where we can, the new board is built and wired next to the old one and the changeover happens in a short window — usually outside production hours — so the factory keeps running while the work is done.
FAQ
Frequently asked questions
Do I really need to upgrade to 3-phase?
How much does a 3-phase upgrade cost?
Do you handle the TNB side as well?
Can you upgrade the DB without changing the supply?
Will the factory have to shut down during the work?
Get a quote
Ask us about a 3-phase upgrade
Fill in the short form — we open WhatsApp with your details prefilled. Or WhatsApp / call us directly.
Adding load or new machinery? Let’s calculate it first.
Free site visit & quote · registered contractor · tested & documented.